Hooke Park material passport

Woodchip Barn project files

Woodchip Barn Team · 2015–16   archive

Hooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.

The team's working files, kept on Hooke Park's server: photographs, scans, models, drawings and spreadsheets. They are there but incomplete, and nothing in them is tied to the pieces themselves. Dates given from these files are the files' own dates. Cited so far: the team's proposed workflow in the Chip Store presentation (25 March 2015, p. 118; its last row is an early design stage), the scanning process sheet drawn on fork 12_A03 (15 July 2015), the two early models of 12_A03, with and without its bark (8 and 11 June 2015), a photograph of a log being debarked in the yard (14 July 2015), the comparison of four models of 09_G15 with the fork (9 July 2015), the per-fork scan models with their reference and check points (July 2015), the scan of 08_D02 and its 64 photographs (22 July 2015), the robot check of six forks: a photograph at the robot (17 July 2015), the 'Robot check' spreadsheet of the robot's readings (20 July 2015), the drawing comparing them with the models (23 July 2015) and a photograph in the Summerbuilders presentation (2 September 2015, p. 57), the assessment catalogue of twenty felled forks (3 August 2015), the models and fork lists sent to Arup (12 March, 30 April and 11 May 2015) and the emails with Arup's engineers (21 April–12 May 2015), the truss volume models (13–28 May 2015), the early truss made of sixty survey outlines (18 May 2015), the catenary centre line of 28 May 2015 kept in the model of the truss as built, the truss iterations (23 July–4 August 2015), the model of the truss as built, version 9.1F (January–February 2016), the team's three-step placement diagram (December 2015), the team's presentation of January 2016 with its speaker's notes (slides 34–43, 51, 63–72, 128), a video of Galapagos fitting a fork (30 May 2015), photographs of the robot finishing limb ends (23 September 2015), the robot task lists and fabrication photographs (September–November 2015), and the scan of 08_C05 (22–23 July 2015). For the Woodchip Barn's walls: the project calendars of 25 March and 14 May 2015, the estimate of the timber for the floor and the walls (14 May 2015), the Chip Store presentation (25 March 2015, p. 47), the January 2016 presentation's slides and speaker's notes on the walls (slides 12, 18–21, 118–123; slide 12 carries a photograph of 10 December 2015), the timber cutting list (12 May 2015), the photographs and count of felled timber at the roadside (5–6 June 2015), the emails with Arup's engineers on the walls (21 April and 11 May 2015), the wall model saved with two truss iterations (24 July 2015), the team's column diagram (February 2016), photographs of the columns being made (10–23 September 2015), of the slab being poured (6 November 2015) and of the truss lift, and the wall columns, planks and steel plates in the model of the Woodchip Barn as built, version 9.1F.