HP-26-G01
Douglas fir posts, laminated
Wood Store prototype, Hooke Park, as laminated stock Wood Store prototype, Hooke Park, as laminated stockdate not recorded QR code https://passport.orbiting.cc/p/hp-26-g01
Tag legend How each value is knownMMeasuredMeasured with an instrument by the person who made the record.MeasuredMeasured with an instrument by the person who made the record.EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.Observed by eyeJudged by looking at the piece: a person's reading, not a measurement.RReconstructed from photographs or remainsWorked out afterwards from photographs, models or the marks left on the piece.Reconstructed from photographs or remainsWorked out afterwards from photographs, models or the marks left on the piece.~EstimatedAn approximate value, not measured.EstimatedAn approximate value, not measured.SReported, unverifiedSaid by someone (an interview, a conversation); not yet checked against the piece.Reported, unverifiedSaid by someone (an interview, a conversation); not yet checked against the piece.?Done by others, to be checkedFrom another team's work or record; this record has not checked it.Done by others, to be checkedFrom another team's work or record; this record has not checked it.DDocumented, checkedFrom a published or archived document, and checked against the piece.Documented, checkedFrom a published or archived document, and checked against the piece.Kinds of blank–Not applicableThe field does not apply to this piece.Not applicableThe field does not apply to this piece.○Not yet recordedNot written down yet, but it can still be; the person named would supply it.Not yet recordedNot written down yet, but it can still be; the person named would supply it.×Done but not recordedThe work was done and nobody wrote it down; it cannot be recovered now.Done but not recordedThe work was done and nobody wrote it down; it cannot be recovered now.◇Recorded but lostIt was written down once, but the record is missing; it may yet be found.Recorded but lostIt was written down once, but the record is missing; it may yet be found.//Chain breaks hereNothing reaches further back; the last known point is given.Chain breaks hereNothing reaches further back; the last known point is given.
Photographs
HP-26-G01/files/photo-2Photograph 2
HP-26-G01/files/photo-3Photograph 3
Basic information
What it is
Douglas fir posts, laminated
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.DDocumented, checkedFrom a published or archived document, and checked against the piece.
Quantity
18 salvaged posts, brought back in three batches of 3, 8 and 7, plus new Douglas fir for the widest layers
How much new Douglas fir was bought in was not recorded.
MMeasuredMeasured with an instrument by the person who made the record.
Where it is now
Wood Store prototype, Hooke Park, as laminated stock
as ofto be filled
MMeasuredMeasured with an instrument by the person who made the record.○Not yet recordedNot written down yet, but it can still be; the person named would supply it.
Current condition
Dimensions and geometry
In the Woodchip Barn twenty of the 22 columns were 225 × 300 mm and the two rear corners about 300 mm square, all 3.2 m long; sliced, the lamellae were cut to the sizes of the glulam layout
The sections and length are the Woodchip Barn team's model of the Woodchip Barn as built, not measured on these posts; which of the two sections each post had is not recorded.
?Done by others, to be checkedFrom another team's work or record; this record has not checked it.MMeasuredMeasured with an instrument by the person who made the record.
Moisture content
Stable under sheeting in the open; no kiln drying needed before use
as ofto be filled
MMeasuredMeasured with an instrument by the person who made the record.○Not yet recordedNot written down yet, but it can still be; the person named would supply it.
Rot and defects
Rot had begun at the screw holes, mortise pockets and bolt openings and spread outwards. Some posts carried little rot and a few small buried screws; the rest had at least one face crowded with screws, rotted mortise remains and old cladding fragments. Slicing showed for the first time how far the decay ran.
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
Visual assessment
Observed by eye. Each lamella was cleared a second time after slicing: rot, breakage and cracks cut back to the layout's dimensions.
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
Model
HP-26-G01/files/modelPhotogrammetric model
○Not yet recordedNot written down yet, but it can still be; the person named would supply it.to be filled
Where it came from
Source
Douglas fir wall columns of the Woodchip Barn, salvaged when it was taken down; new Douglas fir bought in for the widest layersShah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 73Jim, forester at Hooke Park (2026)Interview on where the Wood Store's new Douglas fir came fromInterview by Zhirui Zhang, Hooke Park, 2026. Recording and transcript held by the author.
DDocumented, checkedFrom a published or archived document, and checked against the piece.SReported, unverifiedSaid by someone (an interview, a conversation); not yet checked against the piece.
Detail
Position in the Woodchip Barn
one of the 22 wall columns; which one was not recorded
RReconstructed from photographs or remainsWorked out afterwards from photographs, models or the marks left on the piece.
How it was traced
In two steps: staff at Hooke Park said where the posts lay; and the joints on them, bolt holes at the foot, housings for wall beams and one face crowded with screws, match the Woodchip Barn team's drawings and model of its wall columns, as does a rotted column foot still standing on its steel plate at the old site.The tutor and the foresterWhere the salvaged timber was lyingHooke ParkWoodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.column diagram, February 2016Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016
The batch was traced as a whole, not post by post: no post carries a number, and which of the 22 columns each had been was not recorded.
RReconstructed from photographs or remainsWorked out afterwards from photographs, models or the marks left on the piece.
Joints and machining
As salvaged, the posts carried the Woodchip Barn's joints: bolt holes at the foot, housings for the wall beams, and screws and fragments of planks on one face. All were cut away or cleared before slicing.
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
History
Douglas fir columns in the walls of the Woodchip Barn from late 2015 until it was taken down; then posts lying by the sawmill shelter near the old site; then, sliced and laminated with some new Douglas fir, the glulam stock of the first Wood Store cell. Gluing makes the lamellae one piece, and salvaged and new timber leave the planer looking similar, so the layup map drawn while the layers were on the bench is what marks the salvaged layers, the jointed pairs, the scarf repairs, and the point where the new timber begins.
Rolewall columnsShah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 73DDocumented, checkedFrom a published or archived document, and checked against the piece.
Built at Hooke Park in 2015–16 by the AA Design & Make programme, the Woodchip Barn stood on a truss of beech forks over three timber walls of spruce planks and Douglas fir columns. These posts were among the columns. The steps below are the Woodchip Barn team's, from their group book and project files; the figures in them are theirs, not this record's. Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 73
2015
Walls designedShah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 73
These posts were columns in these walls: the joints they carry are the joints of the team's wall columns.
How it was done · done on the twenty-two Douglas fir columns of the Woodchip Barn's walls
Under the truss the Woodchip Barn had three straight timber walls, two long side walls and a shorter one across the rear, to hold the wood chip and to give a telehandler something to push against; the front gable was left open for the telehandler to come in. The team studied other forms first and tried wall surfaces in 1:20 models and a 1:2 mock-up. By the team's notes, the use of the building, the timber Hooke Park had and what a group of volunteers could make in the time decided the straight walls. The walls were made of horizontal spruce planks fixed to large Douglas fir columns, with beams and studs left standing proud on the outside.Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.pp. 30, 50, 73Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.January 2016 presentation, slides 12, 18–21, 118–119
Other forms, then three straight walls
The team drew and modelled other walls first: interlocking log walls, a waved wall, walls dividing the floor into bays. By the team's notes the operation of the building decided it, with the timber Hooke Park had and what unskilled volunteers could make in the time: three straight walls, the rear one shorter than the side walls because of the site. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.January 2016 presentation, slides 18–21
Studies of other wall forms: interlocking log walls, a waved wall, walls dividing the floor into bays (Woodchip Barn Team)
Planks across, columns proud
The team did not want a massive wall. From the models and the mock-up it chose horizontal planks in a random arrangement, with the columns and beams standing out as separate members on the outside to break up the length of the wall. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.January 2016 presentation, slides 118–119Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 30
The walls from inside before the roof went on: planks across the inner face, the columns outside (Woodchip Barn Team)
Walls that stand on their own
In April 2015 Arup's engineers pointed out that the early scheme was not stable across the building and drew three ways to fix it; the third was a wall of staggered columns, which they compared with a wall in one of the team's models. By 11 May they had modelled the walls standing independently of the truss, with the rafters spanning from truss to wall. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.emails with Arup, 21 April and 11 May 2015
Three ways to make the early scheme stable across the building; the third a wall of staggered columns (Woodchip Barn Team)
Sixty-eight columns, then thirty-six, then twenty-two
The column changed at each stage the files keep. The cutting list of 12 May 2015 asks for 68 columns of larch or fir, 150 by 200 mm and 4 m long. A wall model saved on 24 July 2015 has 36 columns to a building, twenty rising 3.51 m with short posts above them to the roof and sixteen of 2.81 m between them. As built there were 22, of Douglas fir, 225 by 300 mm and 3.2 m long, set in pairs 1.2 m apart along the side walls. Why the team settled on fewer, heavier columns, and why Douglas fir rather than larch, is not written down in the papers read. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.timber cutting list, 12 May 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.wall model, 24 July 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016
The columns at three stages: the cutting list of May 2015, the wall model of July 2015 and the walls as built (list and models: Woodchip Barn Team; drawn by Zhirui Zhang)
The Woodchip Barn taken apart, from the slab with its steel plates (1) to the roof; the walls are 2a to 2f: timber columns, steel uprights, wall planks, the beam-and-stud frame, infill planks and infill beams (Woodchip Barn Team)Wall studies: 1:20 models (top) and 1:2 mock-up panels (below), against a scale in millimetres (Woodchip Barn Team)
DDocumented, checkedFrom a published or archived document, and checked against the piece.
2015
Timber for the walls sawn
Where the trees for these posts grew, and when they were sawn, is not written down in the papers read.
to be filled
How it was done · done on the twenty-two Douglas fir columns of the Woodchip Barn's walls
The team set out to build the walls from Hooke Park's own trees. Its calendar of March 2015 allows timber from 44 trees for the walls; an estimate of May counts 53, each taken as a sawn log 250 mm square and 4 m long. The cutting list of 12 May asks for the columns in larch or fir. In early June the team walked Hooke Park's tracks and counted the felled logs lying at the roadside, lengths estimated rather than measured: spruce, cedar, larch, poplar, redwood, grand fir, and some 66 logs noted only as fir, 3 to 5 m long. The calendar of May has the timber moved to the Wood-Mizer, a portable sawmill, and the uprights and the horizontals sawn. The group book says the columns were sawn green and were not quite straight. Douglas fir grows at Hooke Park, by the forester's account, but where the Douglas fir of these columns grew, who felled and sawed it, and whether any of it came from the logs counted in June is not written down in the papers read.Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.project calendars, 25 March and 14 May 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.timber estimate for floor and wall, 14 May 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.timber cutting list, 12 May 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.felled timber at the roadside, 5–6 June 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.Chip Store presentation, 25 March 2015, p. 47Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 74Jim, forester at Hooke Park (2026)Interview on where the Wood Store's new Douglas fir came fromInterview by Zhirui Zhang, Hooke Park, 2026. Recording and transcript held by the author.
The team's estimate of the trees needed for the floor and the walls, 14 May 2015: 53 for the walls, each counted as a sawn log 250 mm square and 4 m long (Woodchip Barn Team)Felled logs at the roadside at Hooke Park, filed as '5 m fir, 33 logs', June 2015 (Woodchip Barn Team)The count of felled logs by length and species, 5 June 2015 (Woodchip Barn Team)
○Not yet recordedNot written down yet, but it can still be; the person named would supply it.
September 2015
Columns cut and jointed
The posts still carried these cuts when they were brought back: bolt holes, housings for the wall beams, and on one face screws and fragments of the planks.
One of the eighteen posts in the workshop, with the holes and a pocket left by the Woodchip Barn's joints (Zhirui Zhang)How it was done · done on the twenty-two Douglas fir columns of the Woodchip Barn's walls
The columns, beams and studs of the walls were made in the yard and the workshop, then taken to the site as loose parts. By the team's notes the work was done by hand, by volunteers without trade skills and one expert, Jack Draper, who set out the order of work: make the parts first, put them together on site later. The team's photographs of the work are dated September 2015.Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.pp. 73–75Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.photographs, 10–23 September 2015Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.January 2016 presentation, slide 120
The column
Twenty-two columns stood in the walls: ten along each side wall, counting the corners, and two in the rear wall. Twenty were 225 by 300 mm and the two rear corners about 300 mm square; all were 3.2 m long. The spruce planks were fixed across the inner face of the columns, their ends meeting on a column's centre line, and a steel cap on each column's top carried a steel upright to the roof. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.pp. 73, 94
A wall column as the team modelled it: the slot and bolts at its foot, the housings for the wall beams, the steel cap, and the planks on its inner face (model: Woodchip Barn Team; drawn by Zhirui Zhang)
The foot
A steel plate standing up from a base plate on the slab went into a slot sawn up the foot of the column and was bolted through it, in two groups of four bolts; the column stood about 50 mm clear of the slab. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.column diagram, February 2016
Two wall frames as the team drew them: columns with their bolt groups at the foot and housings near the foot and the top, the wall beams and a stud between them (Woodchip Barn Team)
The housings
Near the foot and near the top, each side of a column was cut with a housing 40 mm deep and 100 mm high to take the end of a 200 by 100 mm wall beam. Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 74
Routing a column in the workshop (Woodchip Barn Team)
Measured from one line
Sawn green, the columns were not quite straight, so every measurement on a column was taken from one line set out along it, and jigs were made to place the tools for the notches and grooves. By the group book, the parts showed no deviation when they were lifted onto the steel plates. Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.p. 74
Drilling a column through a guide, 14 September 2015 (Woodchip Barn Team)
Columns being worked on trestles in the yard at Hooke Park (Woodchip Barn Team)
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
November–December 2015
Walls assembled and raisedWoodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.9.1F truss model, January–February 2016
Which of the 22 columns each of these posts had been was not recorded, when the Woodchip Barn was built or when it was taken down.
The 22 wall columns of the Woodchip Barn as built, in red; which of them these eighteen posts were is not recorded (model: Woodchip Barn Team; drawn by Zhirui Zhang)
To be supplied by: Hooke Park
How it was done · done on the twenty-two Douglas fir columns of the Woodchip Barn's walls
The concrete slab, with the steel plates for the columns on it, was poured on 6 November 2015. The plan had been to put up the truss first and the walls and roof after it; because the slab was late, the walls went up first. The team split each wall into panels. Each large panel of columns and beams was put together lying flat on the ground beside its plates and lifted into place by telehandler, without a crane and without anyone working at height or on ladders, and the smaller pieces were filled in afterwards. The truss was craned in over the standing walls: a photograph of 10 December 2015 shows the walls standing under the truss, before the roof. Steel uprights rising from the wall columns then carried the roof panels.Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang (2016)Wood Chip Barn: Project Book 2016AA Design & Make MArch 2015/16, Architectural Association, Hooke Park. Print file WCBGroupBookFinal_Print1, 100 pp., Woodchip Barn project files.pp. 50, 75, 85–86, 94Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.January 2016 presentation, slides 12, 120–123Woodchip Barn Team (2015–16)Woodchip Barn project filesHooke Park server, Woodchip Barn folder (01_ADMIN; 02_DRAWINGS; 03_PHOTOS; 06_PRESENTATIONS; 10_PROJECT PORTFOLIO; 12_3D Scanning). Copy held by the author.photographs, 6 November 2015, 10 December 2015 and of the truss lift
Wall panels put together flat on the ground beside the steel plates on the slab (Woodchip Barn Team)A wall panel lifted into place by telehandler (Woodchip Barn Team)Volunteers fitting an infill panel between two columns (Woodchip Barn Team)The walls standing under the truss before the roof went on, 10 December 2015 (Woodchip Barn Team)A side wall from outside, the columns standing proud of the planks (Woodchip Barn Team)
×Done but not recordedThe work was done and nobody wrote it down; it cannot be recovered now.
Stage 2
Taken down with the Woodchip Barn · 2023
2023
Taken down with the Woodchip Barn and set aside
Not all the columns came away: some were left standing at the old site; the one photographed is a column foot, rotted around its steel plate.
A column foot still standing on its steel plate at the old site of the Woodchip Barn (Zhirui Zhang)
To be supplied by: Hooke Park
How it was done · the same for every Woodchip Barn piece
By Charlie Corry Wright's account, the Woodchip Barn was known to be failing for some years before it came down. A repair was agreed, an exoskeleton of new legs, and Hooke Park's staff had begun to build it, but the rot had gone too far: the structure became unsafe and the repair was cancelled. The Woodchip Barn was taken down by an outside dismantler, in effect one man with a digger and a grab, over three or four days by his estimate; it was too dangerous for students or staff. Nothing was written down about the timber that was kept. Forks and Douglas fir were piled around the site, with no plan for them beyond the wish to use them for something, and have been moved several times since; by whom is not certain.Corry Wright, Charlie (2026)Interview on the Woodchip Barn take-down and A Forest DatumInterview by Zhirui Zhang, Hooke Park, 15 September 2026. Recording and transcript held by the author.
×Done but not recordedThe work was done and nobody wrote it down; it cannot be recovered now.
Rolemain stock for the first cellMMeasuredMeasured with an instrument by the person who made the record.
date to be filled
RetrievalThe tutor and the foresterWhere the salvaged timber was lyingHooke Park
Location given by the tutor and the forester: the posts lay by the sawmill shelter near the old Woodchip Barn site. Posts brought to the workshop by telehandler. Eighteen posts, in three batches of 3, 8 and 7.
The posts loaded by telehandler at the sawmill shelter (Zhirui Zhang)The three batches as they came back: 3, 8 and 7 posts (Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Sorted by condition
By eye, face by face. Some posts were fairly clean, with a little rot and a few buried screws; the rest had at least one face crowded with screws, rotted housings and fragments of the old planks. Rot had begun at the screw holes, housings and bolt openings and spread from them.
A post that needed only a first clean-up (Zhirui Zhang)A post with one face crowded with screws, fragments of old joints and rot (Zhirui Zhang)
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
date to be filled
Block sampling around a screw sample
Exposed screws concentrated on one face and all of one model, so a sample stood for the rest. Cuboid blocks taken out around sampled screws. Depth the screws ran, how far rot had travelled along them, and the sound wood beyond; a removal thickness.
Where a face carried too many fixings to take out one by one, the deepest fixing was found and the whole face cut back to that depth plus an allowance (orange); below, the first batch of three posts (drawn by Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Removing embedded metal: bandsaw pass
Removal thickness from the block sampling, marked along each post with redundancy; detector run along the line first. Posts taken to the sawmill and one thickness taken off each fouled post on the horizontal bandsaw. Metal and rot cleared from that face.
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Removing embedded metal: shop-made tube extractor
Detector gave a rough position, a drill bit found the start by sound, a hole saw showed the direction. Buried and distributed screws taken out with the surrounding rotten wood. Stock safe for the saw blade; detector re-checked after.
Working note on the two routes through the batch: sampling and resawing the posts with crowded faces, a first clean-up for the rest (photographs and drawing by Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Slicing
Direction settled against the glulam layout: a post yields wider lamellae or more of them, not both. Posts became lamellae. Lamellae to the layout's sizes.
From this operation the record is held as a batch. The finished stock answers which layers are salvaged and which are new; it does not answer which lamella came from which post.
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Making good the rot
By eye, against the layout's dimensions. Rot, breakage and cracks cut back on each lamella. Lamellae within the layout's dimensions.
A corroded screw shank opened by the saw, and the face of a lamella from the same batch: screw holes, staining and splits that could not be seen from the surface (Zhirui Zhang)
EObserved by eyeJudged by looking at the piece: a person's reading, not a measurement.
date to be filled
Making good the rot: splitting and jointing the wide layers
Posts came from one building, alike in section, and fell short of the width parts of the layout called for. Wider layers, among them the top members of the glulam side panels, split down their length and jointed. Grain continuity intact, the split being along the grain.
A wide layer split along its length and rejoined side by side, the joint following the grain: the cut marked, the two halves numbered, the pair clamped (Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Making good the rot: scarf repairs
A lamella long enough but locally broken, often at an old mortise. Damaged length replaced. Scarf joint in a low-stress zone.
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
Making good the rot: defects kept towards the ends
Where no sound lamella ran the full length, the engineer's stress drawings showed the zones of a component that carried least. The defect kept rather than cut out, placed towards the component's end, and made good after gluing.
Full-length components laid out and trimmed on the bench, the kept defects set towards the ends (Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
date to be filled
New Douglas fir bought inJim, forester at Hooke Park (2026)Interview on where the Wood Store's new Douglas fir came fromInterview by Zhirui Zhang, Hooke Park, 2026. Recording and transcript held by the author.
Remaining salvaged stock too narrow for the widest layers, the first cell being complete. New timber entered the batch. By the forester's account, all the Douglas fir used for the Wood Store was bought in: a first batch of wide boards from Adrain Jensen's Eggardon Sawmills, then logs from Sherwood Forestry. Which of these went into the widest layers was not written down. Quantity of the new timber was not recorded, so the yield and the timber used per module cannot be worked out.
to be filled
×Done but not recordedThe work was done and nobody wrote it down; it cannot be recovered now.
date to be filled
Layup
Glulam stock layout, adjusted to what this batch could provide. Layers laid up and glued. Layup map: salvaged layers, jointed pairs, scarf repairs, and where the new timber begins.
Salvaged (orange) and new (blue) timber in the glulam stock, layer by layer for each component, with the share of salvaged timber for each component and for the prototype; worked out from the stock used, not from the finished components (drawn by Zhirui Zhang)
MMeasuredMeasured with an instrument by the person who made the record.
15 September 2026
The method looked back onCorry Wright, Charlie (2026)Interview on the Woodchip Barn take-down and A Forest DatumInterview by Zhirui Zhang, Hooke Park, 15 September 2026. Recording and transcript held by the author.
Asked afterwards about the cleaning, Charlie Corry Wright thought the metal detector and the shop-made extractor a smart method, since a screw buried deep in timber has no easy way out. He questioned its cost: the hours of labour to get the metal out, and how much was scrapped after slicing for splits and knots. In his view the posts would have been better kept whole and designed around as solid pieces, with no metal to take out and less to throw away. It worked here as an exercise, he said, but would be hard to make pay commercially. How much was scrapped after slicing was not recorded, so his point cannot be put in numbers from this record.
SReported, unverifiedSaid by someone (an interview, a conversation); not yet checked against the piece.
Shah, Sahil, Zachary Mollica, Swetha Vegesana, Mohaimeen Islam, and Yung-Chen Yang · 2016 book
The team's own book of the project, first printed in 2016. Page numbers given here are the print file's page order, six more than the number printed on the page (p. 22 is printed 16, p. 36 is printed 30). p. 22 is the page of survey photographs, each standing fork traced in red with its number; p. 36 maps where the twenty-five forks were felled. Where HP-26-S01 shows these pages, the orange frame around 08_C05 is added by Zhirui Zhang and is not in the book.
That no Douglas fir had been felled at Hooke Park for the Wood Store and all of it was bought in: a first batch of wide boards from Adrain Jensen's Eggardon Sawmills, then logs from Sherwood Forestry, because buying was cheaper than bringing the contractor in to fell. Reported, unverified: the speakers in the transcript are inferred, and the quantities were not given.
Both the Douglas fir posts and the dormant forks were found on their word. Reported, unverified: it told us where to look, and the attribution rests on the pieces themselves.
The team's working files, kept on Hooke Park's server: photographs, scans, models, drawings and spreadsheets. They are there but incomplete, and nothing in them is tied to the pieces themselves. Dates given from these files are the files' own dates. Cited so far: the team's proposed workflow in the Chip Store presentation (25 March 2015, p. 118; its last row is an early design stage), the scanning process sheet drawn on fork 12_A03 (15 July 2015), the two early models of 12_A03, with and without its bark (8 and 11 June 2015), a photograph of a log being debarked in the yard (14 July 2015), the comparison of four models of 09_G15 with the fork (9 July 2015), the per-fork scan models with their reference and check points (July 2015), the scan of 08_D02 and its 64 photographs (22 July 2015), the robot check of six forks: a photograph at the robot (17 July 2015), the 'Robot check' spreadsheet of the robot's readings (20 July 2015), the drawing comparing them with the models (23 July 2015) and a photograph in the Summerbuilders presentation (2 September 2015, p. 57), the assessment catalogue of twenty felled forks (3 August 2015), the models and fork lists sent to Arup (12 March, 30 April and 11 May 2015) and the emails with Arup's engineers (21 April–12 May 2015), the truss volume models (13–28 May 2015), the early truss made of sixty survey outlines (18 May 2015), the catenary centre line of 28 May 2015 kept in the model of the truss as built, the truss iterations (23 July–4 August 2015), the model of the truss as built, version 9.1F (January–February 2016), the team's three-step placement diagram (December 2015), the team's presentation of January 2016 with its speaker's notes (slides 34–43, 51, 63–72, 128), a video of Galapagos fitting a fork (30 May 2015), photographs of the robot finishing limb ends (23 September 2015), the robot task lists and fabrication photographs (September–November 2015), and the scan of 08_C05 (22–23 July 2015). For the Woodchip Barn's walls: the project calendars of 25 March and 14 May 2015, the estimate of the timber for the floor and the walls (14 May 2015), the Chip Store presentation (25 March 2015, p. 47), the January 2016 presentation's slides and speaker's notes on the walls (slides 12, 18–21, 118–123; slide 12 carries a photograph of 10 December 2015), the timber cutting list (12 May 2015), the photographs and count of felled timber at the roadside (5–6 June 2015), the emails with Arup's engineers on the walls (21 April and 11 May 2015), the wall model saved with two truss iterations (24 July 2015), the team's column diagram (February 2016), photographs of the columns being made (10–23 September 2015), of the slab being poured (6 November 2015) and of the truss lift, and the wall columns, planks and steel plates in the model of the Woodchip Barn as built, version 9.1F.
Why the Woodchip Barn came down and how; that nothing was written down at take-down; how the stock was moved and stacked afterwards; how the five supports of A Forest Datum were picked and charred. Reported, unverified: the selection criteria are his reconstruction, not a recovered record, and the char depth is his estimate.
Further reading
This is background reading. It is not an assessment of this piece.
In wet wood the steel corrodes inside the crevice it occupies, acidifying and breaking down the wood around it. General research, not an assessment of any piece in this stock.
Kasal, Bohumil, and Ronald W. Anthony · 2004 paperOnline ↗
Internal decay routinely leaves no surface sign (p. 95). Vocabulary for the condition fields comes from here. General research, not an assessment of any piece in this stock.
The engineers' calculations for the Woodchip Barn, made before it was built: loads, the truss and its connections, the timber columns of the walls (pp. 29–31) and the steel props. They take the columns as Douglas fir and all the timber as used green, and show the steel plate and bolts at the foot of a column. They are design calculations, not a test of the timber, and not an assessment of any piece salvaged from the Woodchip Barn.
Annotation14 sourced · 4 blank
14 entries carry a source; 4 cells are blank, each with its kind of gap and the person who would have to supply it.